To Erect/Suspend; Controls Before Operational Start-Up; Operation; Mains Connection - FLORABEST FTP 400 E Translation Of The Original Instructions

Submersible water pump
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 17
G B
I E
• For the use of a tap connector with
internal thread (G 1") for connecting ex-
ternal hose connection systems, cut the
top three connections off directly over
the G 1" threaded pipe.
• Connect a tap connector with internal
thread (G 1 ½") directly to the angle
adapter (11).
The measurement of the maximum
performance data takes place
under optimal conditions, such as
a straight, direct exit. The angle
adaptor (11) and the backflow stop-
per (
10) may reduce output.
To increase pump output, the backflow stopper
(
10) may be taken out of the angle adap-
tor (11) (see "replacing backflow stopper").
This is particularly recommended for hose
connections smaller than 1". Please bear in
mind that the water may then flow back dur-
ing pumping, or in the event of a power cut.
To erect/suspend
The pump can be erected or sus-
pended in the water.
The cord (12) contained in the
delivery contents may be used to
suspend and/or extract the pump.
The pump shaft should have the dimen-
sions 40 x 40 x 50 cm at least, so that the
float switch can move freely.
Fix the nylon rope (12) onto the carrying
handle (1).
Ensure that the equipment is
not hung up or held by the
mains cable. There is a risk
of electric shock from dam-
aged mains cables.
2 2
Note that, over time, dirt and sand
may collect on the bottom of the shaft,
which could damage the pump.
We recommend placing the pump
on a brick or a grid.
If the water level is too low, the silt in
the shaft can quickly dry out and im-
pede the pump when warming up.
Controls before operational
start-up
• Check that the float switch is work-
ing (see chapter: "Operation").
• Check that the pump is resting on the
pit base
• Check that the pressure line has been
attached properly
• Check the proper status of the electrical
plug socket and make sure that the plug
socket is sufficiently fused (at least 6 A).
Insert the pump plug into the plug socket
and the pump is ready for operation.
• Make sure that moisture or water never
come in contact with the mains connec-
tion.There is a risk of electrocution.

Operation

Mains connection

The submersible water pump acquired by
you is already provided with an grounded
plug. The equipment is designed for con-
nection to an earthed wall socket with a
residual current operated device (RCD
switch) at 230 V ~ 50 Hz.
Only start to operate the device
after all the above conditions have
been observed.

Advertisement

Table of Contents
loading