Chapter 5: Administration Site
•
Click Cancel to discard any changes you have made.
•
Click Save to schedule the backup as specified. The Scheduled Backup
List table refreshes with the new job displayed; see Figure 89.
If you selected Backup Immediately, the backup job begins and
proceeds in the background. Administering the Qube 3 while a backup
is running is not recommended.
✍
Note: Do not interrupt or cancel the backup job. If the backup job
fails, delete the partial backup file from your computer. If you try to
restore a partial backup file, you can corrupt the data on your
Qube 3.
Figure 88. Add Scheduled Backup table
Figure 89. Scheduled Backup table
176
Cobalt Qube 3 User Manual