In order to provide a minimum level of safety, the operators must always comply
with the '5 golden rules':
1.
2.
3.
4.
5.
the working area with safety panels, if necessary.
Before these operations have been carried out, the system is to be considered as
energised and nobody should be allowed to work on it.
To test for absence of voltage it is compulsory to use measuring instruments of Class
III - 1,000 Volt.
Ingeteam Energy, S.A. cannot be held responsible for any damage arising from any
improper use of its products.
Pg. 6 de 40
Disconnect the power supply
Make sure the system cannot be powered on unexpectedly
Test for absence of voltage
Earth and short-circuit the system
Protect yourself against any energised device in close proximity and mark