The safety valve must be regularly checked, about
4 times a year. Inspection is made by turning the safety
valve knob anti­clockwise, upon which water should
flow through the overflow pipe. If this does not happen
then the safety valve is defective and must be changed.
The safety valve sometimes releases a little water after
hot water has been tapped. This discharge is caused by
the expansion of the cold water taken into the water
heater, resulting in a pressure increase, upon which the
safety valve opens.

Dealing with malfunctions

If the water fails to heat up, check the fuses in the dist­
ribution box. If none of the fuses have blown, the rea­
son may be that the temperature limiter has tripped as
a result of a fault in the water heater. Once the fault has
been remedied, the temperature limiter can be reset,
see illustration. This must be done under the supervision
of a qualified electrician.
Check the mixer valve (D) setting.
Wait a few hours without tapping any hot water and
check whether the temperature level has risen. If there
is still no hot water, contact the installation engineer.
2-phase installation
LEK
STB
Limitation
3-phase installation
LEK
6
K
L E
K
L E
K
L E
TR
Thermostat
Emptying
Turn off the power to the water heater.
Shut off the cold water inlet with valve (A).
Loosen the cover of the drain valve (8) and mount the
supplied hose connector and hose.
NOTE! The drain valve will open as soon as the supplied
hose connector is mounted.
During draining, air must be let into the water heater by
loosening the hot water connection (42) or a hot water
tap. In order to ensure the complete emptying of the
water heater the hose connection must be completely
tight and the outlet be below the lowest point of the
water heater.
When mounted in locations exposed to the risk of frost,
the water heater must be emptied whenever not in ope­
ration. Freezing will result in the water heater bursting.

Technical specifications

Maximum operating pressure for the water heater is 0
bar.
Type
Output
Time required for
heating to 45°C
Time required for
heating to 80°C
Fuses
Type
Output
Time required for
heating to 45°C
Time required for
heating to 80°C
Fuses
Heating up times apply to inlet water temperatures of
0 °C.
Service
Contact the main contractor when a service is necessary.
You must then state the serial number (95) 4 digits.
NOTE! All work to electrical connections must be car­
ried out under the supervision of a qualified electrician.
Only equipment supplied by NIBE AB in Markaryd may
be used.
ES 24
K
L E
160
(kW)

3
6

(h)
6,5 2,5 ,5 8,5 3,0 ,5
(h)
3,0 4,5 2,5 6,5 5,5 3,0
K
L E
(A)
6
0
0
6
300
(kW)

3
6
3
(h) ,0 4,0 2,0
7,0
(h)
22,0 7,5 4,0
4,0
(A)
6
0
0
0
210
3
6
0
0
500
6
3,5
7,0
0

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Es -210Es -300Es -160Es -500

Table of Contents