GB
Dimensions
170
*
200
41
10*
42
9
5
13
14
8
11
Ø D
95
* ES 500
Type
Volume
H
(litres)
(mm)
ES 60
60
980
ES 20
200
20
ES 300
270
380
ES 500
500
695
4
D
HW
V.v.
K.v.
CW
C
47
B
A
The following equip
ment should be fitted
to the cold water pipe.
A Shutoff valve
B Nonreturn valve
47 Safety valve (supp
lied)
C Vacuum valve
D Mixer valve (if tap
water temp ex
ceeds 65 °C)
D
Weight
Conn hw/
cw
(mm)
(kg)
(mm)
600
55
22
600
70
22
600
85
22
750
40
35
Equipment
8 Drain valve
9 Connector housing containing:
4 Terminal block
5 Combined thermostat and temperature limiter
(only for kW / 3 kW)
6 Immersion heater (only for kW / 3 kW)
2 Immersion heater (only for 6 kW)
3 Combined thermostat and temperature limiter
(only for 6 kW)
4 Output selector (only for 6 kW)
0 Lifting eye (only ES 500)
Adjustable feet
4 Cold water connection
42 Hot water connection
47 Safety valve Ø 22 mm, 9 bar (supplied)
95 Serial number sign
Assembly
The copperlined water heater must be assembled up
right and can be aligned using the adjustable feet ().
When mounting the unit be sure to leave enough room
for the dismounting of thermostat or element in front of
the connector housing (approx. 400 mm).
Dismounting of insulation
(applies only to ES 500)
The ES 500 can be made less bulky upon installation by
removing the insulation (water heater diameter without
insulation is Ø 650).
n Remove electric casing and electric plate.
n Loosen all the screws along the joining plate on
both jacket halves.
n Lift off the top cover.
n Pull the insulating jacket
halves straight off.
Carry out assembly in the
reverse order. If the screws are
difficult to fit in the old holes,
the plate can be turned up
side down, which gives new,
unused holes in the insulated jacket halves.
Finally fit all the enclosed cover discs on each connec
tion by pressing them over the connections.
Once the water heater is in the required position remo
ve the lifting device from the top and fit the the accom
panying insulation plug in the hole left by the lifting eye
(0).
NOTE! Fit the cover discs before the pipe installa-
tion is made.
ES 24