Parts; Metric Measurement - GPI TM Series Operation Manual

Electronic water meters
Hide thumbs Also See for TM Series:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
Dimensions - inches (W x H x L):
1/2 inch
2 x 2.5 x 4.3
3/4 inch
2 x 2.7 x 5.3
1 inch
2 x 3 x 6
1-1/2 inch
2.3 x 3.6 x 7
2 inch
2.8 x 4.1 x 7.5

Metric Measurement

Unit of Measure: Litre
Flow Range:
1/2 inch
3.8 - 38 LPM
3/4 inch
7.6 - 76 LPM
1 inch
19 - 190 LPM
1-1/2 inch
38 - 380 LPM
2 inch
76 - 760 LPM
Accuracy: ± 3.0% (Accuracy can be
improved with field calibration)
Operating Temperature:
Storage Temperature: –40° to +70° C
Product Weight:
1/2 inch
.141 kg
3/4 inch
.173 kg
1 inch
.232 kg
1-1/2 inch
.368 kg
2 inch
.518 kg
Dimensions - cm (W x H x L):
1/2 inch
5.1 x 6.4 x 10.9
3/4 inch
5.1 x 6.9 x 13.5
1 inch
5.1 x 7.6 x 15.2
1-1/2 inch
5.8 x 9.1 x 17.8
2 inch
7.1 x 10.4 x 19.1
*
Do not allow fluid to freeze inside meter.
*
0° to +60° C

PARTS

The following replacement parts and acces-
sories are available for the TM Series meters:
Part No.
Description
113520-1
Battery Replacement Kit
116001-1
Calibration Container, Large (5 gallon)
901002-52
O-Ring
125508-01
1/2 inch, Soc Turbine Assy Kit
125508-02
1/2 inch NPT, PVC Turbine Assy Kit
125510-01
3/4 inch, Soc Turbine Assy Kit
125510-02
3/4 inch NPT, PVC Turbine Assy Kit
125512-01
1 inch, Soc Turbine Assy Kit
125512-02
1 inch NPT, PVC Turbine Assy Kit
125514-01
1-1/2 inch, Soc Turbine Assy Kit
125514-02
1-1/2 inch NPT, PVC Turbine Assy Kit
125516-01
2 inch, Soc Turbine Assy Kit
125516-02
2 inch NPT, PVC Turbine Assy Kit
Computer Kits:
125509-01
1/2 inch, Computer Assy Kit
125511-01
3/4 inch, Computer Assy Kit
125513-01
1 inch, Computer Assy Kit
125515-01
1-1/2 inch, Computer Assy Kit
125517-01
2 inch, Computer Assy Kit
SERVICE
For warranty consideration, contact your local
distributor. If you need further assistance, con-
tact the GPI Customer Service Department at:
1-800-835-0113
You will need to:
• Provide information from the decal on your
meter.
Receive a Return Authorization number.
• Flush any fluid from the meter before ship-
ping to the factory.
• If possible leave customer installed fittings
or ample length of bare pipe for reinstalla-
tion.
! ! ! CAUTION ! ! !
Do not return the meter without specific
authority from the GPI Customer Service
Department. Due to strict regulations gov-
erning transportation, handling, and disposal
of hazardous or flammable liquids, GPI will
not accept meters for rework unless they
are completely free of liquid residue.
5

Advertisement

Table of Contents
loading

Table of Contents