Unpacking - Emerson Rosemount CT5100 Reference Manual

Continuous gas analyzer
Hide thumbs Also See for Rosemount CT5100:
Table of Contents

Advertisement

Install
October 2019
Figure 5-1: Clearance with Door Open
A. Door open
B. Door closed
C. Door opening arc
5.2

Unpacking

This procedure requires a minimum of two people to safely remove the equipment from
the shipping container.
WARNING
HEAVY INSTRUMENT - LIFTING HAZARD
Handle the analyzer with caution during unpacking, installation, maintenance, and
transport to prevent crushing of hands, feet, or other body parts.
The analyzer weighs 121 lb. (55 kg) and should always be lifted and moved using suitable
lifting/moving equipment. Emerson recommends that a minimum of two people using
suitable tools for transportation and lifting are employed.
Wear suitable protective gloves and protective footwear.
48
Reference Manual
00809-0100-4512
Rosemount CT5100(Ex)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rosemount ct5100 ex

Table of Contents