6-UNPACKING
6.1 Uncrating
Cut straps. Cut out staple positions along the bottom
of the shipping box or remove staples with an
appropriate tool (Figure 6-1)
After cutting out or removing the staples, lift the
shipping box in order to clear the machine
Note: Two (2) persons required.
Transport the machine with a fork-lift truck to the op-
erating position. Lift the pallet at the point indicated
in Figure 6-2 (weight of machine crated = 290 kg
[631 lbs] approximate).
a80f-NA
Figure 6-1
Figure 6-2
Removal of Pallet
Using a 10mm combination wrench, remove the
fasteners that secure the case sealer legs to pallet at
each leg (as shown in Figure 6-3).
Fasteners
Figure 6-3
Remove the leg height adjustment cap screws and
replace with the cap screws from the tool kit. Loosen
both cap screws. Remove and replace them one at
a time to keep the inner threaded plate in position.
Locate on the machine (or in the spare parts box)
the Height Adjustment and Drive Belt Adjustment
handles. Using a 3mm hex wrench, install the
handles on the side of the machine pointing outward
(as shown in Figure 6-4).
Belt Width
and
Height
Adjustment
Figure 6-4
6.2 Disposal of Packaging Materials
The a80f-NA package is composed of:
- Wooden pallet
- Cardboard shipping box
- Wooden supports
- Metal fi xing brackets
- PU foam protection
- PP plastic straps
- Dehydrating salts in bag
- Special bag of laminated polyester/aluminium/
Polyethylene (sea freight package only)
- Polyethylene protective material
For the disposal of the above materials, please follow
the environmental directives or the law in your country.