Parallel Power Extend Converter Installation - Top Row - Vertiv eSure C48/58-1000B Installation Manual

Power extend converter, mounting bracket kit
Hide thumbs Also See for eSure C48/58-1000B:
Table of Contents

Advertisement

Parallel Power Extend Converter Installation – Top Row
To install a single power extend converter in the top row, refer to the procedure "Single Power Extend
Converter Installation – Top Row" starting on page 15.
Procedure
[ ] 1. Move the grounding tab from the top of the power extend converter to the bottom per Figure 13.
Figure 13:
Moving Grounding Tab from Top of Unit to Bottom
Move grounding tab from top of unit to bottom by removing the screw
securing it to the top. Set the grounding tab and screw aside. Remove
the bottom screw. Secure the screw removed from the bottom location
into the top location (note that it is a different length then the screw used
to secure the grounding tab). Orient the grounding tab in the bottom
location as shown in the illustration and secure with the screw removed
from the top location (longer screw). Torque both screws to 5.8 in-lbs.
[ ] 2. If the power extend converter is to be installed for a newly connected load, connect the load and
load return cables for the position to be occupied by the power extend converter. At the same time,
connect the power extend converter return wire faston tab (P/N 565990) provided with the power
extend converter to the cabinet's return busbar (use the same location as the return lead to the
load). At the same time, connect the power extend converter paralleling busbar (P/N 60016097 for
paralleling two converters, P/N 545346 for paralleling three converters) ordered separately to the
distribution panel load busbars (use the same location as the load lead to the load). See Figure 14.
Torque hardware as indicated in Figure 14.
[ ] 3. If the power extend converter is to replace an existing circuit breaker in the distribution panel,
remove the circuit breaker and verify the load and return cables for the position to be occupied by
the power extend converter are wired correctly. At the same time, connect the power extend
converter return wire faston tab (P/N 565990) provided with the power extend converter to the
cabinet's return busbar (use the same location as the return lead to the load). At the same time,
connect the power extend converter paralleling busbar (P/N 60016097 for paralleling two
converters, P/N 545346 for paralleling three converters) ordered separately to the distribution panel
load busbars (use the same location as the load lead to the load). See Figure 14. Torque hardware
as indicated in Figure 14.
Vertiv
| eSure™ Power Extend Converter Mounting Bracket Kit Installation Manual (IM565460) | Rev. A
M3 x 6 mm
M3 x 4 mm
Flat Head Screw
Flat Head Screw
M3 x 4 mm
Flat Head Screw
M3 x 6 mm
Flat Head Screw
21

Advertisement

Table of Contents
loading

Table of Contents