Sun Microsystems SPARCcenter 2000 Manual page 29

System board
Hide thumbs Also See for SPARCcenter 2000:
Table of Contents

Advertisement

3. For DSBE/S and FSBE/S cards: remove the two outer retaining screws
(refer to Figure 2-9), but do NOT remove the middle screw or the
springfinger.
Use a #0 Phillips screwdriver and a 3/16 nut driver or socket wrench.
4. For DSBE/S and FSBE/S cards, configure jumper J0302 for link integrity
test functionality. Refer to
DSBE/S — Figure 2-9:
FSBE/S — Figure 2-10
a. Put the shunt over both pins to disable the Link Integrity Test, as
shown in Figure 2-11 "Disabled.".
b. Put the shunt in one pin to enable the Link Integrity Test, as shown in
Figure 2-11 "Enabled.".
Caution – If the customer chooses to disable the test, it must be disabled both
!
at the hub and at the SBus card. In the event of "loss of carrier" or "not
responding" problems, check the status of the link enable on both the SBus
card and the hub.
Removing and Replacing System Boards and Assemblies
2
2-9

Advertisement

Table of Contents
loading

Table of Contents