Installation
Routing the Fibre Channel Optical Waveguide Cable
The protective hose (length approx. 1m) supplied with the mounting kit has a
separable design.
Figure 14: Mounting the protective hose
Ê Separate the outside protective sheath (1) from the inside sheath.
Ê Carefully laid the fibre channel optical waveguide cable (3) into the inside
protective sheath (2).
Ê Push the outside protective sheath (1) over the inside protective sheath.
V
CAUTION!
The sheath openings must be arranged moving in opposite direction as
shown in the sectional view A-B.
U41271-J-Z156-2-76
Installing the Rack Model in the Rack
35