Download Print this page

FarmTek Growers Supply 112416S6X10 Instruction Manual page 8

6' wide premium greenhouse benches

Advertisement

3
ASSEMBLE SUPPORT FRAME FOR BENCH TOP—continued
7. Tighten the pipe strap mounting bolts of
the mid support. Tighten until snug. Do not
overtighten. Doing so will strip the threads.
10. Mark the mounting hole position on the inside
of the vertical frame leg.
8 8
Assembly Instructions
8. Check that six (6) band clamps are in position
on the horizontal pipes–eight (8) for the 12'
long bench. See circled clamps above.
11. Start drilling the mounting hole using an
FA4482B Tek screw if desired, or skip to the
next step.
9. Take one strut and attach it to one band clamp.
12. Attach the strut to the tube using the Tek screw
and a 102921B neo-bonded washer.
Revision date: 08.26.15

Advertisement

loading

This manual is also suitable for:

Growers supply 112416s6x12Growers supply 112416s6x08