Page 2
Important Information READ THIS DOCUMENT BEFORE YOU BEGIN Thank you for purchasing the 115554 Ebb & Flo system. When properly assembled and maintained, this system will provide years of reliable service. These instructions include helpful hints and important information needed to safely assemble the system. Please read and understand these instructions before you begin.
Page 3
Attach Leg Tubes 115554HS02 ATTACH LEG TUBES Assemble frame on a flat, level surface. 115554L Bottom 112838 of Leg Tek Screw Tube FAME51B Washer 112477 115554L FALB34B FAG338B Hex Bolt FALB34B 5. Secure leg tubes to 115554HS02 tubes using FAG338B flat Locknut head bolts and FAME51B washers.
Page 4
Assemble Main Frame STEP 2 ASSEMBLE MAIN FRAME Assemble frame on a flat, level surface. 112770 STEP 1 115554CS02 115554CS02 FAME51B FAG338B 1. Use the FAG338B (5/16" x 3") hex head bolts and FAME51B flat washers to complete the frame assembly. Tighten all connections until snug. 2.
Page 5
Prepare Propagation Tray PREPARE 117260 PROPAGATION TRAY (2' x 4') Actual tray design may differ from example shown. Complete these steps to drill the holes in the propagation tray. 1. With assistance, carefully flip the tray over on the assembled frame so the bottom is facing up.
Page 6
Install Bulkhead Fittings INSTALL BULKHEAD FITTINGS System is equipped with two (2) 111301 bulkhead fittings which are used to connect the tray to the lower reservoir. Gather these parts and install the fittings: • 111301 Bulkhead fittings (2) 1. Flip tray over so inside is facing 2.
Page 7
Prepare Reservoir Lid ATTENTION: Actual reservoir, lid, and tube components may differ from the model used in the PREPARE RESERVOIR LID photos. Procedures are similar. Adjust accordingly. The reservoir lid protects tank contents from light and debris, which helps prevent algae growth. During system operation keep this lid in place at all times.
Page 8
Assemble Supply Tube ASSEMBLE SUPPLY TUBE 1. Cut two (2) three inch (3") pieces of 3/4" tubing (WF6504A). 2. Wrap the fitting threads of the 112674 adaptors 3-4 times in a clockwise direction with the supplied thread-sealing tape as shown (WR1095). 3.
Page 9
Install Pump and Attach Supply and Drain Tubes ATTENTION: Actual reservoir, lid, and tube INSTALL PUMP AND SUPPLY TUBE components may differ from the model used in the photos. Procedures are similar. Adjust accordingly. 9. Set pump in reservoir so that the 3/4" 10.
Page 10
Install the Air Pump and Tubing ATTENTION: Actual reservoir, lid, and tube ATTENTION: Always position the air pump above the nutrient level to components may differ from the model used in the prevent siphoning of the reservoir. photos. Procedures are similar. Adjust accordingly. ATTACH THE AIR PUMP AND AERATOR STONES 110077 Air For optimal system performance and to extend the life of the nutrient solution through increased...
Page 11
Adjust Levelers Actual system may differ ADJUST LEVELERS from what is shown. Use the lower photos to determine how to set the slope of the frame. After adjusting each leveler as needed, use photos 1-4 to lock leveler in place. A 9/16" wrench is needed. Adjust levelers so tray is level side- Adjust levelers so tray slopes to-side.
Page 12
Install Bulkhead Screen and Extensions INSTALL BULKHEAD SCREENS AND EXTENSIONS Bulkhead screens and extensions allow you to manage nutrient solution level in the tray. Screens can be used with or without extensions. Depending on the application, extensions can be used with one screen on the drain tube to increase and maintain the nutrient solution level in the tray.
Page 13
Sample System Photo ATTENTION: Actual system may differ. Photo shows a 2' x 8' tray and frame. Plumbing and assembly are the same. Some components shown are not included with ebb & flow kit. Revision date: 05.10.24 115554...
Need help?
Do you have a question about the Growers supply 115554 and is the answer not in the manual?
Questions and answers