3
3.1 Assembling solenoid valve and RFW PCB
Fig. 9: Assembling solenoid valve and RFW PCB (1)
①
②
(1) - Handwheel
(2) - Belt cover
(3) - Solenoid valve
To assemble solenoid valve and RFW PCB:
1. Screw the blanking plug (4) at valve output 2 onto the solenoid
2. Screw the elbow screw joint (5) at valve output 4 onto the solenoid
3. If not yet present, assemble the compressed air maintenance unit to
4. Disassemble the handwheel (1).
5. Disassemble the belt cover (2).
14
Assembling the remaining thread monitor (2-needle machines)
Assembling the remaining thread monitor
(2-needle machines)
WARNING
Risk of injury from sharp and moving parts!
Puncture or crushing possible.
Switch off the machine before assembling the
remaining thread monitor (RFW).
valve (3).
valve (3).
the stand (see Operating Instructions).
③
④
(4) - Blanking plug
(5) - Elbow screw joint
Additional Instructions M-TYPE DELTA - 00.0 - 08/2019
⑤