Assembling the remaining thread monitor (2-needle machines)
Fig. 10: Assembling solenoid valve and RFW PCB (2)
⑥
⑦
(6) - Spacer
(7) - Jumper
(8) - PCB
(9) - Holder
6. Assemble the PCB (8) to the holder (9) using 4 spacers (6).
7. Insert the cable RFW sensor left (10) at slot X2 on the PCB (8).
8. Insert the cable RFW right (11) at slot X1 on the PCB (8).
9. Insert the cable (12) at slot X3 on the PCB (8).
10. Slip 2 jumpers (7) onto the outer pins at slot X4.
Additional Instructions M-TYPE DELTA - 00.0 - 08/2019
⑦
⑧
(10) - Cable RFW sensor left
(11) - Cable RFW sensor right
(12) - Cable
⑫
⑪
⑩
⑨
15