Avaya ERS 3500 Series Manual page 38

Installing transceivers and optical components on ethernet routing switch
Hide thumbs Also See for ERS 3500 Series:
Table of Contents

Advertisement

SFP+
Electrostatic alert:
ESD can damage electronic circuits. Do not touch electronic hardware unless you wear a
grounding wrist strap or other static-dissipating device.
Warning:
Risk of equipment damage
Only trained personnel can install this product.
About this task
Installing an SFP+ transceiver takes approximately 3 minutes.
Procedure
1. Remove the SFP+ transceiver from its protective packaging.
2. Grasp the SFP+ transceiver between your thumb and forefinger.
3. Insert the device into the port on the module.
Depending on the module type, you must insert some SFP+ transceivers into the port with
the bail facing up and some SFP+ transceivers with the bail facing down.
Warning:
Risk of equipment damage
SFP+ transceivers are keyed to prevent incorrect insertion. If the SFP+ transceiver
resists pressure, do not force it; turn it over, and reinsert it.
Apply a light pressure to the SFP+ transceiver until the device clicks and locks into position
in the module.
4. Remove the dust cover from the SFP+ optical bores, and insert the fiber optic cable.
Installing Transceivers and Optical Components on Avaya ERS 3500 Series
38
Comments on this document? infodev@avaya.com
July 2015

Advertisement

Table of Contents
loading

Table of Contents