Commissioning steps
1.) Serial number on the type plate
2.) Electrical wiring / connection / fuse protection checked in
accordance with technical data of installation instructions and
VDE regulations?
2.) System flushed?
3.) System filled and water treatment carried out?
- pH value set
- total hardness set
4.) Appliance and system vented?
5.) System pressure 2.0 - 2.5 bar?
6.) Water connections checked for leaks?
7.) Trap filled?
8.) Gas restrictor inserted according to gas type?
9.) Gas supply pressure checked?
10.) Gas tightness test carried out?
11.) Switch boiler ON, set control unit to OFF / Standby.
12.) Standard setting of control unit set?
60

27. Commissioning report

Test values or confirmation
_______________________________________
________________ pH value
____________________ °dH
Natural gas
LPG
Wobbe index
_____________ kWh/m³
Net calorific value, heating ______ kWh/m³
3064458_201811