Commissioning Report - Wolf CGB-75 Installation And Operating Instructions Manual

Wall mounted gas condensing boiler
Table of Contents

Advertisement

Commissioning steps
1.) Gas type
2.) Gas supply pressure checked?
3.) Gas tightness test carried out?
4.) Air/flue system checked?
5.) Water connections checked for tightness?
6.) Filling the trap
7.) Boiler and system vented?
8.) System pressure 1.5 - 2.5 bar?
9.) System flushed?
10.) Water treatment carried out according to "Technical
information for water treatment".
pH value set
total hardness set
11.) No chemical additives (inhibitors; antifreeze) added?
12.) Gas type and heating output entered on label?
13.) Function test carried out?
14.)
Flue gas test:
Flue gas temperature gross
Inlet air temperature
Flue gas temperature net
Carbon dioxide content (CO
Carbon monoxide content (CO)
15.) Casing fitted?
16.) System user instructed; documentation handed over?
17.) Commissioning confirmed?
40
24. Commissioning report
) or oxygen content (O
2
2
Test values or confirmation
Natural gas E/H
Natural gas LL
LNG
Wobbe Index
Operational calorific value
)
kWh/m³
________________
kWh/m³
________________
________________
pH value
________________
°dH
t
A
________________
t
L
________________
(t
A
________________
(°C)
________________
%
________________
ppm
________________
3062555_201804
(°C)
(°C)
-t
)
L

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cgb-100

Table of Contents