Commissioning steps
1.) Gas type
2.) Gas supply pressure checked?
3.) Gas tightness test carried out?
4.) Air/flue system checked?
5.) Water connections checked for tightness?
6.) Filling the trap
7.) Boiler and system vented?
8.) System pressure 1.5 - 2.5 bar?
9.) System flushed?
10.) Water treatment carried out according to "Technical
information for water treatment".
pH value set
total hardness set
11.) No chemical additives (inhibitors; antifreeze) added?
12.) Gas type and heating output entered on label?
13.) Function test carried out?
14.)
Flue gas test:
Flue gas temperature gross
Inlet air temperature
Flue gas temperature net
Carbon dioxide content (CO
Carbon monoxide content (CO)
15.) Casing fitted?
16.) System user instructed; documentation handed over?
17.) Commissioning confirmed?
40
24. Commissioning report
) or oxygen content (O
2
2
Test values or confirmation
Natural gas E/H
Natural gas LL
LNG
Wobbe Index
Operational calorific value
)
kWh/m³
________________
kWh/m³
________________
________________
pH value
________________
°dH
t
A
________________
t
L
________________
(t
A
________________
(°C)
________________
%
________________
ppm
________________
3062555_201804
(°C)
(°C)
-t
)
L