Commissioning Report - Wolf CGB-75 Assembly And Operating Instructions Manual

Gas condensing boiler
Table of Contents

Advertisement

Commissioning steps
1.) Gas type
2.) Gas supply pressure checked?
3.) Gas leak test carried out?
4.) Balanced flue system checked?
5.) Water connections checked for leaks?
6.) Fill the siphon
7.) Boiler and system vented?
8.) System pressure 1.5 - 2.5 bar?
9.) System flushed?
10.) Water treatment carried out according to the
'Water treatment planning notes'.
pH value adjusted
Total hardness value adjusted
11.) No chemical additives (inhibitors; antifreeze) added?
12.) Entered gas type and output onto label?
13.) Function test carried out?
14.) Flue gas test:
Flue gas temperature gross
Inlet air temperature
Flue gas temperature net
Carbon dioxide content (CO
Carbon monoxide content (CO)
15.) Casing fitted?
16.) System user trained, documentation handed over?
17.) Confirm commissioning?
34

Commissioning report

) or oxygen content (O
2
2
Test value or confirmation
Natural gas H
LPG
Wobbe index
________________
Net calorific value
________________
________________
________________
________________
)
________________
________________
________________
kWh/m³
kWh/m³
______________
pH value
______________
°dH
t
(°C)
A
t
(°C)
L
(t
-t
) (°C)
A
L
%
ppm
3062555_201507

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cgb-100

Table of Contents