Commissioning steps
1.) Serial number on the type plate
2.) Electrical wiring/connection/fuse protection checked in
accordance with technical data from installation instructions
and VDE regulations?
2.) System flushed?
3.) System filled and water treatment carried out in line with
"Technical information, water treatment"?
pH value set
Total hardness set
4.) Appliance and system vented?
5.) System pressure 2.0 - 2.5 bar?
6.) Water connections checked for tightness?
7.) Trap filled?
8.) Gas valve set to gas type?
9.) Gas supply pressure checked?
10.) Gas tightness test carried out?
11.) Switch boiler ON, set control unit to OFF/Standby.
68
35. Commissioning report
Test values or confirmation
___________________________________
_______________ pH value
_______________
Natural gas
LPG
Wobbe index _________________ kWh/m³
Calorific value, heating _________ kWh/m³
°dH