Commissioning steps
13.) Required heating output set in contractor parameter H04?
14.) Gas type set in contractor parameter H12?
15.) Check system configuration and change as necessary
Expert parameter H40
Check hot water configuration and change as necessary
Expert parameter H51
16.) Gas type and output entered on label?
17.) Balanced flue system checked?
18.) Flue gas emissions test (emissions test mode):
Gross flue gas temperature
Intake air temperature
Net flue gas temperature
Carbon dioxide content (CO
Carbon monoxide content (CO)
19.) Casing fitted?
20.) Function test carried out?
21.) System user trained, documentation handed over?
22.) Commissioning confirmed?
3064458_201811
27. Commissioning report
) or oxygen content (O
2
2
Test values or confirmation
1 = Natural gas = 28 kW
2 = LPG = 28 kW
3 = Natural gas = 35 kW
4 = LPG = 35 kW
)
_____________
_____________
_____________
(t
- t
FL
_____________
_____________
_____________
□
□
□
□
□
□
□
□
t
[°C]
FL
t
[°C]
IA
) [°C]
A
%
ppm
□
□
□
□