Wolf CGG-1K-24 Installation And Operating Instructions Manual

Wolf CGG-1K-24 Installation And Operating Instructions Manual

Gas fired wall mounted boiler

Advertisement

Technik,
die dem Menschen dient.
Installation and

operating instructions

Gas fired wall mounted boiler
CGG-1K-24/28
Wolf GmbH · Postfach 1380 · D-84048 Mainburg · Tel. +49-8751/74-0 · Fax +49-8751/741600 · Internet: www.wolf-heiztechnik.de
3062087_0207
1
Part no. 30 62 087
Subject to modifications
02/07
GB

Advertisement

Table of Contents
loading

Summary of Contents for Wolf CGG-1K-24

  • Page 1: Operating Instructions

    Menschen dient. Installation and operating instructions Gas fired wall mounted boiler CGG-1K-24/28 Wolf GmbH · Postfach 1380 · D-84048 Mainburg · Tel. +49-8751/74-0 · Fax +49-8751/741600 · Internet: www.wolf-heiztechnik.de 3062087_0207 Part no. 30 62 087 Subject to modifications 02/07...
  • Page 2: Table Of Contents

    Safety instructions / Standards and regulations ..........3-4 Operation Control / Function / Operation ................5 Installation Dimensions / Installation dimensions ..............6 Layout CGG-1K-24/28 ................... 7-8 Positioning information / Installation ..............9 Installation On finished walls .................... 10 On unfinished walls ..................11 Flue gas butterfly orifice plate / Routing ventilation air / flue gas ....
  • Page 3: Safety Instructions

    Safety instructions The following symbols are used in conjunction with these important instructions concerning personal safety as well as operational reliability. "Safety instructions" are instructions with which you must comply exactly, to prevent injury and material losses. Fig.: Terminal box: Danger from electric current Danger through 'live' electrical components.
  • Page 4: Safety Instructions / Standards And Regulations

    3 mm contact separation. - It is not permitted to carry out repairs on parts that fulfil a safety function. - Use only original WOLF replacement parts or those that are equivalent and that have been approved by the manufacturer.
  • Page 5: Control / Function / Operation

    Control / Function / Operation ON / OFF switch Reset Thermometer button temperature selector Pressure Heating water Illuminated temperature selector gauge signal ring Signal ring as Display Explanation status display Flashing green Standby (power supply ON, burner OFF) Constant green light Heat demand: pump running, burner OFF Flashing yellow Emissions test mode...
  • Page 6: Dimensions / Installation Dimensions

    Dimensions / Installation dimensions 1 Heating flow 2 DHW 3 Cold water 4 Heating return 5 Gas connection Min.40 Minimum clearances 3062087_0207...
  • Page 7: Layout Cgg-1K-24/28

    Layout CGG-1K-24/28 LAF connection flue gas butterfly orifice plate Differential pressure switch Flue gas fan Flue gas Limit thermostat collector box Flow sensor 2 Heating water heat exchanger Combustion chamber Flow sensor 1 Gas burner Monitoring Ignition electrode electrode Expansion vessel...
  • Page 8 Layout Limit thermostat Heating water heat exchanger Flow sensor 2 Expansion vessel Gas burner Gas combination Flow sensor 1 valve Air vent Heating circuit pump Three-way diverter valve DHW heat exchanger Safety valve DHW flow & temperature sensor Drain valve Bypass valve Cold water strainer with Overflow valve...
  • Page 9: Positioning Information / Installation

    Positioning information / Installation General - Determine the installation location for the gas fired boiler; maintain the specified minimum clearances (see the r.h. diagram). - Fit the installation template (paper poster) supplied to the wall. - Transfer the fixing hole and connection positions marked on the installation template to the wall (e.g.
  • Page 10: On Finished Walls

    Fig.: Throughput controller with cold water strainer Hydraulic connections Installation on finished walls - Wolf connection sets (accessories) are available for installation on finished and unfinished walls. The connection Heating flow pipes are Cu 18x1. Cold water...
  • Page 11: On Unfinished Walls

    Installation Fig.: View from below, connection set for installation on finished walls (part no. 86 12 188) Installation on unfinished walls Fig.: Front view, connection set for installation on unfinished walls (part no. 86 12 189) Fig.: View from below, connection set for installation on unfinished walls (part no.
  • Page 12: Flue Gas Butterfly Orifice Plate / Routing Ventilation Air / Flue Gas

    Wolf boilers are certified as one unit with the original Wolf balanced flue system. Use only original Wolf balanced flue systems. Using alternative accessories can lead to incorrect functions.
  • Page 13 Balanced flue system Type C42x Boiler Calculated Flue gas butterfly CGG-1K length A + B orifice plate no. Ø ≤ 2 m 1 (38.0 mm) ≤ 2 m 2 (39.8 mm) Room sealed balanced flue / duct sizing through calculation according to EN 13384 or country-specific standard as atmospheric pressure system with an inlet pressure = 0 Pa Connection to a room sealed balanced flue...
  • Page 14: Power Connection

    (e.g. BM) may be connected to the terminal strip of the gas fired boiler or the terminal strip of the BM. - Connection of digital Wolf control accessories (e.g. ART, AWT, MM, BM) Only connect control units from the Wolf accessory range.
  • Page 15: Filling The System

    Filling the system Filling the system Fill the system and vent it thoroughly to safeguard the perfect function of the gas fired boiler. The heating water must not be mixed with inhibitors or antifreeze; otherwise leaks and flooding could result. - Before connecting the gas fired boiler to the heating system, flush the entire system to remove residues such as welding pearls, hemp, putty, etc.
  • Page 16: Commissioning / Checking The Gas Supply Pressure

    Commissioning / Checking the gas supply pressure Only qualified personnel must carry out the Connect the test equipment commissioning and boiler operation as well as the user instruction to prevent dangers and - The gas fired boiler must be switched OFF. Open the gas injuries as well as material losses.
  • Page 17: Displaying / Modifying Control Parameters

    If parameter A 09 (frost protection limit) is set lower than the factory setting, frost protection is no longer ensured. This can lead to heating system damage. The settings in column 1 apply to control accessories ART, AWT. The settings in column 2 apply to Wolf control systems with programming module BM. Parameters Unit Factory set.
  • Page 18: Limiting The Maximum Output

    Limiting the maximum output The output setting can be modified with Wolf control accessories with eBUS capability via parameter HG 04. The heating output will be determined by the modulation current of the the gas valve. By reducing the modulation current in accordance with the table, the maximum output will be matched at 80/60 °C to natural gas H and LPG.
  • Page 19: Selecting The Pump Stage

    Selecting the pump stage The boiler is equipped with a three-stage pump that is set to stage 2 in the delivered condition. Stage 1 The minimum circulation volume is ensured by a connection Stage 2 line between the flow and return. An automatic overflow valve and a manually adjustable bypass valve are integrated into the Stage 3 connection line.
  • Page 20: Selecting The Pump Stage

    Selecting the pump stage Bypass valve fully opened (delivered condition) 1000 1100 1200 1300 1400 1500 Pump rate [l/h] Bypass valve closed 1000 1100 1200 1300 1400 1500 Pump rate [l/h] 3062087_0207...
  • Page 21: Commissioning Report

    Commissioning report Commissioning steps Actual value or confirmation 1.) Gas type Natural gas H Wobbe index __________________ kWh/m³ Calorific value _________________ kWh/m³ 2.) Calculated flue length ____________________________ m Integral flue gas butterfly orifice plate No. ___________ / ____________ mm 3.) Gas supply pressure checked? ____________________________ mbar 4.) Nozzle pressures checked? (only complete when changing the gas type):...
  • Page 22: Inspection And Maintenance / Service Report

    Inspection and maintenance / Service report Advise the system user that an approved We recommend users arrange a service contract. contractor should clean and check the heating system annually, to safeguard the reliable and economic function of his heating system and to avoid risks to individuals and prevent material losses.
  • Page 23: Service Report

    Service report Service Service Service Service Service Service Service Service Service Service 3062087_0207...
  • Page 24: Service

    Service Cleaning the gas burner: - Switch OFF the boiler at the ON / OFF switch, isolate it from the power supply and close the gas shut-off valve. - Remove the casing lid of the gas fired boiler. For this, pivot the control unit lid down, hook in the r.h.
  • Page 25 Service Cleaning the DHW heat exchanger Cleaning the strainer in the cold water inlet Subject to the water quality it may be advisable to regularly - Close the cold water inlet on the system side. descale the DHW heat exchanger on the DHW side. - Remove the cold water inlet shut-off valve on the equipment side.
  • Page 26: Conversion To Other Gas Types

    Boiler No. of nozzles Natural gas LPG butane/propane Nozzle ID Nozzle Ø mm Nozzle ID Nozzle Ø mm CGG-1K-24 1.35 0.80 CGG-1K-28 1.35 0.80 Table: No. of nozzles, nozzle size - Reassemble the boiler in reverse order. - Continue with adjusting the control unit.
  • Page 27 Conversion to other gas types 2. Adjusting the control unit: ON / OFF switch Reset Thermometer ON / OFF button temperature selector Pressure Heating water Illuminated temperature selector gauge signal ring - At the system ON / OFF switch, switch the boiler first OFF and then ON again.
  • Page 28: Cgg-1K

    Natural gas H Butane Propane Ws = 14.1 kWh/m³ Ws = 24.3 kWh/m³ Ws = 21.3 kWh/m³ = 50.7 MJ/m³ = 87.3 MJ/m³ = 76.8 MJ/kg CGG-1K-24 10.4 Pmin 2.1 ± 0.5 4.5 ± 0.5 6.0 ± 0.5 24.0 26.7 Pmax 12.3 ±...
  • Page 29 Conversion to other gas types Output CGG-1K-24 G31 (propane) / G30 (butane) Details relate to 1013 mbar air pressure and 15 °C gas temperature WHG 24 G31 (Propan) G31 Propane G30 Butane WHG 24 G30 (Butan) Nozzle pressure [mbar] Output CGG-1K-28 G31 (propane) / G30 (butane) Details relate to 1013 mbar air pressure and 15 °C gas temperature...
  • Page 30 Conversion to other gas types Output CGG-1K-24 natural gas Details relate to 1013 mbar air pressure and 15 °C gas temperature Nozzle pressure [mbar] Output CGG-1K-28 natural gas Details relate to 1013 mbar air pressure and 15 °C gas temperature...
  • Page 31: Conversion To Other Gas Types

    Conversion to other gas types Readjusting the gas valve: Carry out the nozzle pressure adjustment in the following order: - Remove transparent plastic cap from the gas combination valve. - Operate the boiler in emissions test mode (Pmax). - Adjust the maximum pressure at nut (spanner size 10).
  • Page 32: Flue Gas Test

    Flue gas test The flue gas emissions must be tested with the boiler closed. Testing the combustion air - Remove the screw from the test port "inlet air". - Open the gas shut-off valve. - Inset the test probe until it bottoms out. - Start the boiler and turn the heating water temperature selector to emissions test [chimney sweep symbol].
  • Page 33: Wiring Diagram

    Wiring diagram 3062087_0207...
  • Page 34: Specification

    Specification Type CGG-1K-24 CGG-1K-28 Rated output Rated thermal load 26.7 31.1 Lowest output (modulating) 10.9 Lowest thermal load (modulating) 10.4 12.0 Heating flow ¾" ¾" Heating return ¾" ¾" DHW connection ¾" ¾" Cold water connection ¾" ¾" Gas connection ¾"...
  • Page 35: Fault / Cause / Remedy

    Troubleshooting Any faults will be displayed as fault code by Wolf controllers with eBUS capability. To these faults, cause and remedy may be allocated using the following table. This table is designed to allow your local heating contractor to trace the fault more easily.
  • Page 36: Ec Declaration Of Conformity

    Dichiarazione di conformita campione di costruzione - EG Con la presente dichiariamo che le nostre caldaie Murali a Gas Wolf e le caldaie a Gas Wolf corrispondono al e campioni di costruzione, come sono descritte nel certificato di collaudo EG „campione di costruzione“ e che esse soddisfano le disposizioni in vigore nella normativa: 90/396/EWG apparecchiature a Gas.

This manual is also suitable for:

Cgg-1k-28

Table of Contents