Time And Items Required For Installation - Extreme Networks ExtremeRouting SLX 9850-4 Hardware Installation Manual

Table of Contents

Advertisement

NOTE
This device is suitable for connection to the Central Office and where NEC requirements apply. Additionally, it may be installed
in either a Common Bonding Network (CBN) or Isolated Bonding Network (IBN).

Time and items required for installation

You can set up and install the device in either a two- or four-post rack. Refer to
applicable rack mount kits.
The following table describes the main installation and setup tasks and the estimated time required for each, and the items required to
complete the task for a device.
These time estimates assume a prepared installation site and appropriate power and network connectivity.
TABLE 15 Installation tasks, time, and items required
Installation task
Site preparation and unpacking the device
Installing rack mount kit
Mounting and securing the device in the rack
Installing power cables and powering on the
device
Establishing serial connection, logging in to the
device, and configuring IP addresses
Installing an Ethernet cable, opening a Telnet
session, and configuring the device domain ID,
date and time, and additional system
parameters. Verify and back up the
configuration.
ExtremeRouting SLX 9850-4 Hardware Installation Guide
9035474-02 Rev AA
Time estimate
30 minutes
30 minutes
30 minutes
20 minutes
20 minutes
20 minutes
Supported hardware and software
Items required
#2 Phillips screwdriver.
Pallet jack.
Tinsnips or strapping cutter (used to cut carton
straps).
Hydraulic lift or assisted lift, able to raise to a
minimum of 140 cm (55 in.), with a minimum
capacity of 212 lb (96.2 kg) for the SLX
9850-4 Router
To know the weight of your device fully
populated with the required interface modules,
refer to the
ExtremeRouting SLX 9850
Technical Specifications
Refer to instructions in
page 31.
Refer to instructions in
page 31.
Use the power cables provided in the device
accessories kit.
Refer to instructions in
device
on page 58.
Requires the following items:
Serial cable provided in the accessory
kit.
Workstation computer with a serial
port or terminal server port and a
terminal emulator application (such as
HyperTerminal).
Ethernet IP address for the device.
Ethernet cabling (optional) for Telnet access.
Refer to
Initial Setup and Verification
57 for more information.

Time and items required for installation

on page 11 for
on page 137 .
Mounting the Device
on
Mounting the Device
on
Providing power to the
on page
25

Advertisement