UPS Transition Time

Transition time is the time that is necessary for the UPS to transfer from utility power to full-load
battery power. For Extreme Networks products, a transition time of less than 20 milliseconds is required
for optimum performance.

DC Power Requirements

A DC-powered system should be installed in a DC-I battery return configuration. In a DC-I
configuration, the battery return conductor should be connected directly to the central office power
return bus, and not to the equipment frame or the grounding means of the equipment.
The E4G-200 can accept -48 or +24 volts for DC input.

Applicable Industry Standards

For more information, see the following ANSI/TIA/EIA standards:
ANSI/TIA/EIA-568-A—discusses the six subsystems of a structured cabling system.
ANSI/TIA/EIA-569-A—discusses design considerations.
ANSI/TIA/EIA-606—discusses cabling system administration.
ANSI/TIA/EIA-607—discusses commercial building grounding and bonding requirements.
You can access these standards at:
http://www.ansi.org
or
http://www.tiaonline.org
E4G Series Routers Hardware Installation Guide
Applicable Industry Standards