Please ensure that you have carefully read the section of "Preparation before Installation".
Make sure that the requirements set forth in "Preparation before Installation" have been met.
Installation Flowchart
Confirmations before Installation
Before installation, please confirm the following points:
Whether sufficient airflow is available for the switch
Whether the requirements of the switch for temperature and humidity are met
Whether power cables are already laid out and whether the requirements of electrical current are met
Whether related network adaption lines are already laid out
Product Installation
·
Need help?
Do you have a question about the RG-S2910C-XS-P Series and is the answer not in the manual?