Device Installation; Environment Requirement; Install The Device On To A Rack; Grounding - Raisecom ISCOM2109F Hardware Installation User Manual

Table of Contents

Advertisement

www.raisecom.com
③ The Fit screw used to fix sub card on to the switch.
2) Sub card installation
Please install sub cards following the steps below:

4.2 Device installation

4.2.1 Environment requirement

There are heat exhaust outlets on both sides of ISCOM2109F switch. Please leave space on both
sides of the switch to keep air flow unblocked. Please make sure the outlets are not blocked.

4.2.2 Install the device on to a rack

To set the switch firmly into a rack, please fix the installation tray to the switch using the four screws
come with the device and fasten the installation handle on to the rack.

4.2.3 Grounding

To ensure the safety of the device and the operator, please make sure that the grounding terminal is
well connected to the earth.

4.3 The connection of the switch

4.3.1 Connect to console

ISCOM2109F switch provides a RS-232 interface in the form of RJ-45 as the CONSOLE interface.
After connecting the CONSOLE interface of ISCOM2109F switch to the serial port on the PC using
the provided cable, users can configure and manage the switch through PC.
The CONSOLE interface of ISCOM2109F is in the form of RJ-45. The RJ-45 connector and jack
and the corresponding pin number is shown in the figure below.
Please check and be sure that the power supply of the switch is cut off.
Remove the cover board of the expansion socket.
Insert the sub card into the expansion socket following the track inside the socket.
Tighten the fit screws on the sub card to fix the sub card in the expansion socket.
Connect the sub card using network cable or fiber according to need.
a)
CONSOLE interface signal definitions of the switch
OFF
The corresponding port is in Link Down
status.
User Manual
9

Advertisement

Table of Contents
loading

Table of Contents