Installation - RDZ WHR 60 Technical And Installation Manual

Mechanical ventilation with heat recovery appliance
Table of Contents

Advertisement

CONSTRUCTION
The product is composed of a wall mounted unit to be placed inside the room, a recessed duct
which contains the ceramic heat exchanger and filters and an external wall mounted conveyor.
Ceramic heat
conveyor
Recessed duct
Wall mounted
unit

INSTALLATION

Installation must only be carried out by properly qualified person.
Make sure that the main electrical supply in the installation room is disconnected before starting
the electrical operations of assembly.
The appliance must not be installed near curtains, drapes, etc. as these could compromise the
correct working of the product.
Make sure that, once installed, the fan blades are placed not less than 2,30m away from the floor
below to the product.
Before assembling or using this product, carefully read all the instructions in this manual and be
sure to own all the necessary material for the installation.
Scrupulously follow the instructions in this manual.
1) ASSEMBLY
Once the area of installation is selected, mark the center of the hole to be realized on the wall
Make sure that on internal and external walls there is enough space, for a radius of 15 cm from
the center, thus corresponding to the product overall dimensions. Therefore make sure that,
within this area, there are not any interferences with other walls or non-removable objects.
Hole diameter for installation is Ø160mm
The duct must be installed through the hole, with a slight downward slope of 1° - 2° towards the
outsight to allow proper discharge of condensation.
To use the supplied recessed duct, the thickness of the wall must not exceed 400mm.
External wall
mounted conveyor
External flter
Internal filter
25