Working Instructions - RDZ WHR 60 Technical And Installation Manual

Mechanical ventilation with heat recovery appliance
Table of Contents

Advertisement

4) PRODUCT ASSEMBLY AFTER CLEANING
Re-assemble the main unit (3) with the shutter (2) and cosmetic cover (1) on the wall-mounting
(4i).
ATTENTION: if different products are cleaned at the same time, re-mount every principal unit in
the specific compartment from which they had been removed in order to avoid communication
problems between Master unit and Slave unit.
Once the main unit has been re-installed on wall, turn on the product by the main switch. The
reset of the cleaning counter must be driven by remote control.
How to reset after filter cleaning operation is explained in the controller instruction manual.

WORKING INSTRUCTIONS

ON/OFF Main Switch (0/1)
In case of one unit, turn on the product through "0/1" switch and then set a function by remote to
activate the product accordingly. In case of more units, refer to paragraph "MASTER-SLAVE
PRODUCTS CONFIGURATION" and, once this procedure is ended, turn ON the products through
0/1 switch and press a function by remote to activate the device.
ATTENTION:
By running the first time, the product performs the auto calibration of the hygrostat.
It is possible that during this step the products runs in "EXTRACTION" to bring the humidity of the
environment at the necessary level for the auto calibration.
PROBLEMS
If the product does not turn on, or in case of function problems such as strange noise, disconnect
the product by setting on "0", the "0/1" main switch placed on product side. Contact immediately
your retailer and ask for assistance.
38

Advertisement

Table of Contents
loading

Table of Contents