Chapter 3 Installation; General; Preparation For Use; Initial Inspection - TDK-Lambda GENESYS 750W HALF RACK Technical Manual

Programmable dc power supplies
Hide thumbs Also See for GENESYS 750W HALF RACK:
Table of Contents

Advertisement

CHAPTER 3
INSTALLATION

3.1 GENERAL

This Chapter contains instructions for initial inspection, preparation for use and repackaging for
shipment. Connection to PC, setting the communication port and linking Genesys
plies are described in Chapter 7.
Genesys
might affect the operation of other instruments. If your
equipment is susceptible to magnetic fields, do not position it
adjacent to the power supply.

3.2 PREPARATION FOR USE

In order to be operational, the power supply must be connected to an appropriate AC source.
The AC source voltage should be within the power supply specification. Do not apply power be-
fore reading Section 3.6 and 3.7.
Table 3-1 below, describes the basic setup procedure. Follow the instructions in Table 3-1 in the
sequence given to prepare the power supply for use.
Step no.
1
Inspection
2
Installation
3
AC source
4
Test
5
Load connection
6
Default setting
3.3 INITIAL INSPECTIONS
Prior to shipment this power supply was inspected and found free of mechanical or electrical de-
fects. Upon unpacking of the power supply, inspect for any damage, which may have occurred in
transit.
The inspection should confirm that there is no exterior damage to the power supply such as bro-
ken knobs or connectors and that the front panel and meters face are not scratched or cracked.
Keep all packing material until the inspection has been completed. If damage is detected, file a
claim with carrier immediately and notify the TDK-Lambda Americas Inc. sales or authorized ser-
vice facility nearest you.
TM
power supplies generate magnetic fields, which
Item
Initial physical inspection of the power supply
Installing the power supply,
Ensuring adequate ventilation.
AC source requirements
Connecting the power supply to the AC source
Turn-on checkout procedure.
Wire size selection. Local/Remote sensing.
Single or multiple loads.
The power supply setting at shipment.
Table 3-1: Basic setup procedure
NOTE
Description
13
83-507-5002 Rev. B
TM
power sup-
Reference
Section 3.3
Section 3.4
Section 3.5
Section 3.6
Section 3.7
Section 3.8
Section 3.9
Section 7.2.1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the GENESYS 750W HALF RACK and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents