Handing over the unit to the operator
If there is a delay between the installation/start-up
of the unit and transfer to the operator, both ex-
changer columns must be manually regenerated
in succession.
The operator must be told how the unit works as
well as how to operate and inspect it. Ensure that
the operator receives the installation and operating
manual.