Page 3
Use of post-treated drinking water for plants Use of post-treated drinking water for plants Use of post-treated drinking water for plants Use of post-treated drinking water for plants collection point or send them to BWT post-free. and aquatic animals and aquatic animals and aquatic animals...
Page 4
Duplex Duplex Duplex soft soft soft soft water water water water unit unit unit unit AQA Perla AQA Perla AQA Perla AQA Perla with: Duplex Duplex soft water unit AQA Perla 1 1 1 1 1 Microprocessor control with TFT touch...
Page 5
Function VDC; 0.5 A). The connection of a mineral compound dosage AQA Perla is a duplex soft water unit based on the device and an error message system is possible ionic exchange principle. The unit is operated with at any time.
Page 6
Einbauvorbedingungen Einbauvorbedingungen Es muss geprüft werden, ob der Anlage ein Mine- Einbauvorbedingungen Einbauvorbedingungen Einbauvorbedingungen ralstoff-Dosiergerät zum Schutz vor Korrosion nach- geschaltet werden muss. Örtliche Installationsvorschriften, allgemeine Richt- linien, allgemeine Hygienebedingungen und techni- Für die Aufstellung der Anlage einen Ort wählen, sche Daten beachten.
Page 7
Korrosions- produkte oder Eisen- und Manganablage- rungen verursacht wurden, bzw. für daraus entstehende Folgeschäden übernimmt BWT keine Haftung. Bei Verwendung von Regeneriermittel, das nicht der DIN EN 973 Typ A entspricht er- lischt die Gewährleistung. 7 7 7 7 7...
Page 8
installaion diagram installaion diagram installaion diagram installaion diagram installaion diagram Dosier- Aqua- Filter gerät stop Water stop, pressure reducer, dosing unit are options that may be required, depending on operating conditions Floor drain Installation Installation Installation Installation Installation Multiblock X Multiblock X Multiblock X Multiblock X...
Page 9
Attach the rinsing water hose (11 11) firmly to the Y piece. Lead the rinse water hose (11 11) with the gradient to the drain and secure the end against “pressure wobble” with the enclosed fastening material. Attach overflow hose (18 x 24) to the safety overflow 12), secure with cable connector and lead with a gradient of at least 10 cm to the drain.
Page 10
Operation and display of the control unit Operation and display of the control unit Operation and display of the control unit Operation and display of the control unit Operation and display of the control unit Operating display Operating display Operating display Operating display Operating display Water consumption...
Page 11
Commissioning Commissioning Commissioning Commissioning Commissioning Check that unit has been properly installed (in compliance with DIN 1988, Part 4). Use AQUATEST to measure and record the hardness of the drinking water before it enters the 2 2 2 2 2 soft water unit.
Page 12
What do you want to do? What do you want to do? The What do you want to do? What do you want to do? What do you want to do? image appears. If no key is pressed, the unit automatically regenerates both columns in turn after 3 minutes.
Page 13
Enter hardness reading for drinking water. Correct figures Confirm Blended water hardness Enter desired blended water hardness (residual hardness). (BWT recommendation 4° - 8° dH. In 6 6 6 6 6 Austria a residual hardness of > 8.4 °dH is prescribed). Confirm...
Page 14
6 6 6 6 6 Sodium content Sodium content Sodium content Sodium content Sodium content Increase by 115 mg/l Increase by 115 mg/l Increase by 115 mg/l Increase by 115 mg/l Increase by 115 mg/l Store and continue Commissioning rinse is executed The brine chamber is automatically filled with drinking water (takes about 25 minutes).
Page 15
Location of blending valve (V V V V V ). Close the blending valve in a clockwise direction and then increase the hardness of the blended water by gradually opening it (expanding arrow). To check run off > 500 l/h water at the nearest cold water tapping point, check the hardness of the blended water (residual hardness) using the AQUATEST hardness tester, and adjust it at the...
Page 16
Checklist Checklist Checklist Checklist Checklist for proper installation by a professional installer After installation and After installation and After installation and After installation and After installation and commissioning you commissioning you commissioning you commissioning you commissioning you Has all packaging material been removed from the brine cabinet? can use this list to can use this list to...
Page 17
Operation Operation Operation Operation Operation Please note separate operating instructions for Multiblock Module and DN 32/32 Connection Set. For regular regenerations (after volume control or time-priority control) an additional disinfection is not necessary. Under unfavourable circumstances, e.g. longish down times in warm installation rooms, an additional disinfection operation by the customer service may become necessary for regeneration pur- poses.
Page 18
Data acquisition displays the consumption values for water and regenerants. The curve shows the through-flow over the period of the past 24 hours, in 3 sections of 8 hours each. After 15 minutes the screen saver appears with the data of the contact person. The appropriate entries make the operating mode Any Sanitary Any Sanitary...
Page 19
Enter desired blended water hardness (residual Sodium content Sodium content Sodium content Sodium content Sodium content hardness). (BWT recommendation 4° - 8° dH. In Increase by 131 mg/l Increase by 131 mg/l Increase by 131 mg/l Increase by 131 mg/l Increase by 131 mg/l Austria a residual hardness of >...
Page 20
S e r v i c e S e r v i c e S e r v i c e display appears after 500 regenerations or after 12 months. Maintenance must be performed by BWT vice vice Service vice vice Customer Service.
Page 21
Change settings Change settings Change settings Change settings Change settings Here you can change the time, date, water hardness, language (installation site) and settings (Unit Setup). Under Contact you will find the relevant customer service and installing company. Changing the time Changing the time Changing the time Changing the time...
Page 22
Once setting is complete press Confirm Once setting is complete press Confirm Once setting is complete press Confirm Once setting is complete press Confirm Once setting is complete press Confirm Technical work is reserved for Customer Service (password-protected) Setting options in Unit Setup: Setting options in Unit Setup: Setting options in Unit Setup: Setting options in Unit Setup:...
Page 23
1 to 6 months 1 to 6 months 1 to 6 months 1 to 6 months Have BWT Customer Service perform a Close main isolation valve. regeneration of both exchanger resin columns Disconnect soft water unit from mains (close using Dioxal disinfectant.
Page 24
The replacement of worn parts must carried out recommendations and must be shortened by the by qualified specialists (installing company or BWT operator accordingly in dealing with sensitive Customer Service). We recommend concluding a consumer systems. maintenance agreement with your installing company or the BWT Customer Service.
Page 25
T T T T T roub roub roub leshooting leshooting roub roubleshooting leshooting leshooting Fault Fault Fault Fault Fault Cause Cause Cause Cause Cause Remedy Remedy Remedy Remedy Remedy Salt deficiency is displayed. Too little regenerant in the Replenish with regenerant and storage chamber (3 3 3 3 3 ).
Page 26
Soft water unit Soft water unit T T T T T y p e y p e y p e y p e y p e AQA Perla AQA Perla AQA Perla AQA Perla AQA Perla Nominal connection width 32 (G 1 ")
Page 28
BWT Ceská Republika s.r.o. BWT Ceská Republika s.r.o. BWT Ceská Republika s.r.o. BWT Ceská Republika s.r.o. BWT Polska Sp. z o.o. BWT Polska Sp. z o.o. BWT Polska Sp. z o.o. BWT Polska Sp. z o.o. BWT Polska Sp. z o.o.
Need help?
Do you have a question about the AQA perla and is the answer not in the manual?
Questions and answers