Maintenance - Stuart Turner Monsoon Extra Installation Instructions Manual

Medium pressure n1.3 bar, high pressure n2.4 bar, high pressure n2.9 bar, high pressure n3.7 bar negative single duty pump
Table of Contents

Advertisement

4.
Starting The Pump
a) Ensure all outlets are closed, turn power supply 'on' - pump will start, pressurise
the system then stop.
b) Open and close all outlets in turn associated with the pump, (including w/c
systems) allowing water to flow from each outlet until all air is purged. As each
outlet is opened and closed, the pump will start and stop respectively.
Note: After closing the outlet there will be a small delay time before the pump
stops, which is normal.
Any tap or control valve within the system when opened and closed will now turn
the pump on/off. Providing this is the case the system is now operating correctly.
c)
Carefully check pump and pipework for leaks whilst pump running and stationary
before leaving the installation unattended.
For Further Technical Support
Phone the Stuart Turner Monsoon support line on 01491 572655. Our staff are trained
to help and advise you over the phone or arrange for a service engineer to call.

MAINTENANCE

WARNINGS:
Care should be taken to protect pump from frost and freezing,
particularly when located in loft position.
Pump Location
If possible site the pump in a location where in the unlikely event of a
water leak, any spillage is contained or routed to avoid electrics or
areas sensitive to water damage.
2.
Disconnect electrical supply before working on pump.
3.
Turn off water supplies to the pump and release pressure by opening water outlets
before attempting maintenance.
4.
The inlet strainer incorporates a removable gauze filter which may require periodic
cleaning. The frequency of this operation is dependent upon installation conditions.
The strainer is located in the inlet pipework to the pump (see page 9). The gauze
filter is removed as follows:-
a) Isolate pump electrically.
b) Release all system pressure.
c)
Isolate water supply.
d) Remove screwed hexagonal plug from strainer body (see page 9).
e) Remove and clean stainless steel gauze filter.
f)
Re-assemble gauze and secure plug tightly.
g) Turn on water supplies, connect power supply and test.
5.
The pressure vessel air pre-charge does not require routine maintenance. Should
ever the need arise for the vessel to have its air pre-charge checked or replenished, it
should be carried out as follows:-
a) Isolate pump electrically.
b) Isolate both the hot and cold inlet water supplies by closing the appropriate
isolating valves.
1. No routine maintenance is required, but provision should be made
for easy access to the pump to allow repairs due to normal wear
and tear.
- 14 -

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Monsoon Extra and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents