1. System Flushing
This pump incorporates push-in connectors and plastic components that
must not come into contact with solder flux, acid-based descalents or
aggressive cleaning agents. The pipework system should be flushed out
prior to the pump being connected to ensure any contaminants/chemical
residues and foreign bodies are removed from elsewhere in the system.
2. Water Supply
Always ensure that water storage capacity is adequate to meet the
demand. Ensure the pump chamber is full of water before starting the
pump. Failure to do this could result in seal damage. To ensure dry
running does not occur the pump must be primed as described in priming
section. Do not run pump dry.
3.
Priming
The pump must be primed (filled with water) before starting. Turn on water supply,
prime and vent the pump by unscrewing the priming plug (Figs. 15, 16 & 17) slowly
until all air escapes and water emerges. Re-tighten the plug.
N1.3 bar Single
Fig. 15
Priming
Plug
PUMPS
N3.7 bar Single
Fig. 17
- 13 -
PUMPS
N2.4 and N2.9 bar Single
Fig. 16
Priming
Plug
Priming
Plug
Need help?
Do you have a question about the Monsoon Extra and is the answer not in the manual?
Questions and answers