Cortesia de/ Courtesy of: www.batmotos.com
17
. BATTERY/CHARGING SYSTEM
Check the continuity between the Green wire
terminal and ground.
There should be continuity at all times.
Measure the resistance between each Yellow
wire terminals.
Standard: 0.4-0.6 Ω (20ºC/68ºF)
Disconnect the regulator/rectifier connector.
Check for continuity between each Yellow
wire terminal regulator/rectifier side and
ground.
There should be no continuity.
Cortesia de/ Courtesy of: www.batmotos.com
DOWNTOWN 125i
17-8