System Start-Up; Sto Commissioning - Danfoss VLT Midi Drive FC 280 Operating Instructions Manual

Hide thumbs Also See for VLT Midi Drive FC 280:
Table of Contents

Advertisement

Commissioning

5.8 System Start-up

The procedure in this section requires user-wiring and
application programming to be completed. The following
procedure is recommended after application set-up is
completed.
1.
Press [Auto On].
2.
Apply an external run command.
3.
Adjust the speed reference throughout the speed
range.
4.
Remove the external run command.
5.
Check the sound and vibration levels of the
motor to ensure that the system is working as
intended.
If warnings or alarms occur, see chapter 8.2 Warning and
Alarm Types for resetting the frequency converter after a
trip.

5.9 STO Commissioning

Refer to chapter 6 Safe Torque Off (STO) for the correct
installation and commissioning of STO.