Transporting The Shredder - HSM SP 5080 Operating Manual

Channel baling press
Hide thumbs Also See for SP 5080:
Table of Contents

Advertisement

3.6

Transporting the shredder

– Place the shredder on a smooth level surface at the installation site.
– Remove the packaging foil and dispose of it in a manner that is environmentally
sound.
– Cut through the steel straps.
– Roll the shredder off the pallet in accordance with the unpacking instructions. The
shredder can now be moved on its rollers.
• The loading table must be mounted at the installation site.
04/2013
Caution!
When moving the shredder, note that it may topple over. Danger of falling
over!
2.990.999.120_en
SP 5080
21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents