Preparations; General Instructions; Siting The Machine; Supply Connections - HSM SP 5080 Operating Manual

Channel baling press
Hide thumbs Also See for SP 5080:
Table of Contents

Advertisement

3

Preparations

3.1

General instructions

We strongly recommend that installation work on the baling press should be carried out
by trained HSM engineers.
We accept no liability for damage resulting from incorrect installation.
If you do perform installation tasks yourself, make sure you have read and fully understood
the entire operating manual before you start.
3.2

Siting the machine

When deciding where to install the machine (e.g. planning by the customer) make
sure there is enough space around the machine so that assembly and repair work can
be carried out without obstruction. Upstream and downstream machines are to be arranged
accordingly.
The installation on the prepared foundation must be carried out in such a way that the
shredder press combination is level.
The shredder press combination may only be operated in dry rooms.
At temperatures below 0 °C and above 30 °C respectively, use different hydraulic oil that
has a suitable viscosity for the baling press or upgrade the tank heater/oil cooler.
3.3

Supply connections

Power is supplied via the central control cabinet of the baling press. The control cabinet
has a power connection cable with a CEE plug.
The installation site must have a CEE 5x32A/6H power socket with an appropriate fuse.
(see "Technical data")
3.4

Settings

In general, all the components have been installed, and the electrical and hydraulic lines
connected.
The electrical and hydraulic settings for the various components have been performed
by HSM.
04/2013
Caution!
Unauthorised adjustments to the set values are prohibited and could
seriously damage the machine.
2.990.999.120_en
SP 5080
19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents