Transporting The Baling Press; Transport To Another Application Site - HSM SP 5080 Operating Manual

Channel baling press
Hide thumbs Also See for SP 5080:
Table of Contents

Advertisement

3.5

Transporting the baling press

Always use the special bearing points for loading the machine from a lorry using a forklift.
– Place the baling press on a smooth level surface at the installation site.
– Remove the packaging foil and dispose of it in a manner that is environmentally sound.
– Cut through the steel straps.
– Using a forklift, lift the baling press by approximately 10 cm and remove the wooden blocks.
– Open the inspection fl ap and remove all the items delivered with the machine from the press
chamber.
3.5.1

Transport to another application site

If only a short distance has to be covered, the baling press can be rolled to the application
site. The new installation site must have a suffi cient fl oor loading capacity and
comply with the space requirements as well as having an appropriate power socket.
20
Caution!
Installations on the electrical system or control cabinet may only be carried
out by a qualifi ed electrician or one of our service engineers.
2.990.999.120_en
SP 5080
04/2013

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents