Precor GEN06 Series Service Manual page 81

Table of Contents

Advertisement

7. Disconnect the wiring from the AC input module (1 blue wire, 1 brown wire and 1
green/yellow wire).
8. Remove the mounting screws and remove the AC input module. Keep fasteners for
replacement installation:
9. Set the AC input module in its mounting position with the side with two terminals facing
the circuit breaker and install using the previously removed fasteners.
10. Re-connect the AC input module blue wire to terminal N, the brown wire to terminal L
and the green/yellow wire to terminal E.
11. Insert the AC line cord firmly into the input module. Set the AC line cord clamp in its
mounting position and fasten it with the previously removed fasteners.
12. Reinstall hood.
1
13.
Plug
in the power cord and Switch the input power ON.
14. Verify treadmill operation per "" and return to service.
.See Also
"Replacement Procedures" on page 48
1
Device power cord connector or electrical cable male connector that is inserted into an elec-
trical receptacle "outlet" (also called the plug-in).
Contact Precor Customer Support at support@precor.com or 800.786.8404 with
any questions.
6 Replacement Procedures
Input Module Replacement
Page 74

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

C952Trm10 seriesC954C956C966

Table of Contents