5. Reinstall the Fiber Optic.
Figure 10-13
Fiber Optic Location
Note
Refer to the figure entitled
6. Connect the cables to the L1, L2 and L3 input terminals of the power cell by means of bolted
connections.
7. Connect the cables to the T1 and T2 output terminals of the power cell by means of bolted
connections.
Air Cooled 6SR5
Operating Instructions, 07/2018, A5E42736645A_AB
Fiber Optic Connector Location.
Maintenance
10.6 Remove and Replace
95