Unpacking - Siemens SINAMICS PERFECT HARMONY GH180 Operating Instructions Manual

Medium voltage variable frequency drive, air cooled 6sr5
Hide thumbs Also See for SINAMICS PERFECT HARMONY GH180:
Table of Contents

Advertisement

Preparing for Use

5.11 Unpacking

5.11
Unpacking
Note
Comply with All On-Site Requirements
Siemens recommends that the operating areas be dry and free of dust. The environment
should not contain any electrically conductive gas, vapors, or dust, which could impair
operation.
Upon receipt of the drives:
1. Perform a visual inspection to assure shipment is not damaged.
2. Verify that all items are received.
3. Carefully remove the plastic wrap and load securing devices.
4. Do not remove the packaging until immediately prior to installation.
5. If equipment will not be placed in operation after installation, cover louvers and external
openings to prevent entry of dust, moisture, and contaminants. In addition to covering
louvers and openings, Siemens recommends covering the equipment cabinet with a tarp
or protective cover.
6. Packaging material should not be discarded if filing for a shipment damage claim is required.
If no shipment damage claim is required, discard the packaging material in accordance with
the applicable country-specific guidelines and rules.
7. Prior to commissioning, protect the cabinets against dust, moisture, and contaminants by
covering the ventilation opening and keeping the doors/panels closed.
8. Do not remove handling and storage instructions from the cabinet(s).
Note
Damage During Shipment
If damage occurs during shipment, contact the shipping carrier to file a claim. For technical
assistance, call Technical Support - Worldwide Centers (800-333-7421).
48
Operating Instructions, 07/2018, A5E42736645A_AB
Air Cooled 6SR5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents