HP ElitePOS G1 Disassembly Instructions Manual page 51

14 inch touch aio retail system model 141
Table of Contents

Advertisement

Document No. Nantucket bezel Air bonding DIS SOP
Name
:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Heat the disassembly equipment
Tabulator:
Uen-Tung
Standard Operation Procedure
Disassemble Glass
Auditor :Uen-Tung
Ver. :
Step:
1. LCM module puts into Nantucket to heat to
heat in the disassembly equipment
Note:
• Time:5Min
• Heat the temperature:80±5℃
Fig.1
Qty
Holding fixture list (holding fixture standard)
1
Station :
1.0
Date
Issue department:
9(1/1)
2017/6/5
:
Qty
NPSU-PPE

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents