Document No. Nantucket FA DIS ASS'Y SOP
Name
:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Electric cross screwdriver #1
Tabulator:
Uen-tung
Standard Operation Procedure
Loosen M/B Screw
2
4
6
Auditor :Uen-tung
Ver. :
Step:
1. Loosen M/B Screw*6
5
Qty
Holding fixture list (holding fixture standard)
1
Station :
1.0
Date
3
1
Issue department:
13(2/3)
2017/6/13
:
Fig.1
Qty
NPSU-PPE