HP ElitePOS G1 Disassembly Instructions Manual page 17

14 inch touch aio retail system model 141
Table of Contents

Advertisement

Document No. Nantucket FA DIS ASS'Y SOP
Name
:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Electric cross screwdriver #1
Tabulator:
Uen-tung
Standard Operation Procedure
Disassemble CFD
Fig.1
Fig.2
Auditor :Uen-tung
Ver. :
Step:
2. Disassemble CFD Cable
3. Disassemble CFD module
Qty
Holding fixture list (holding fixture standard)
1
1.0
Issue department:
8(1/1)
2017/6/13
:
Qty
NPSU-PPE

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents