Document No. Nantucket FA DIS ASS'Y SOP
Name
:
1
4
5
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Electric cross screwdriver #1
Tabulator:
Uen-tung
Standard Operation Procedure
Disassemble FAN
3
2
Fig.1
Fig.2
Fig.3
Auditor :Uen-tung
Ver. :
Step:
1. Loosen FAN screw*5
2. Disassemble FAN
Qty
Holding fixture list (holding fixture standard)
1
Station :
1.0
Date
Issue department:
14(1/2)
2017/6/13
:
Qty
NPSU-PPE