HP ElitePOS G1 Disassembly Instructions Manual

HP ElitePOS G1 Disassembly Instructions Manual

14 inch touch aio retail system model 141

Advertisement

Product End-of-Life Disassembly Instructions
Product Category: Personal Computers
Marketing Name / Model
[List multiple models if applicable.]
HP ElitePOS G1 14 inch Touch AiO Retail System Model 141
Purpose: The document is intended for use by end-of-life recyclers or treatment facilities. It provides the basic instructions
for the disassembly of HP products to remove components and materials requiring selective treatment, as defined by EU
directive 2002/96/EC, Waste Electrical and Electronic Equipment (WEEE).
1.0 Items Requiring Selective Treatment
1.1 Items listed below are classified as requiring selective treatment.
1.2 Enter the quantity of items contained within the product which require selective treatment in the right column, as
applicable.
Item Description
Printed Circuit Boards (PCB) or Printed Circuit
Assemblies (PCA)
Batteries
Mercury-containing components
Liquid Crystal Displays (LCD) with a surface
greater than 100 sq cm
Cathode Ray Tubes (CRT)
Capacitors / condensers (Containing PCB/PCT)
Electrolytic Capacitors / Condensers measuring
greater than 2.5 cm in diameter or height
External electrical cables and cords
Gas Discharge Lamps
Plastics containing Brominated Flame Retardants
weighing > 25 grams (not including PCBs or PCAs
already listed as a separate item above)
Components and parts containing toner and ink,
including liquids, semi-liquids (gel/paste) and toner
Components and waste containing asbestos
Components, parts and materials containing
refractory ceramic fibers
EL-MF877-00
Template Revision B
Notes
With a surface greater than 10 sq cm
All types including standard alkaline and lithium
coin or button style batteries
For example, mercury in lamps, display backlights,
scanner lamps, switches, batteries
Includes background illuminated displays with gas
discharge lamps (14")
Power cord
Include the cartridges, print heads, tubes, vent
chambers, and service stations.
PSG instructions for this template are available at
EL-MF877-01
Quantity
of items
included
in product
3
1
0
1
0
0
0
1
0
0
0
0
0
Page 1

Advertisement

Table of Contents
loading

Summary of Contents for HP ElitePOS G1

  • Page 1 Purpose: The document is intended for use by end-of-life recyclers or treatment facilities. It provides the basic instructions for the disassembly of HP products to remove components and materials requiring selective treatment, as defined by EU directive 2002/96/EC, Waste Electrical and Electronic Equipment (WEEE).
  • Page 2 Components, parts and materials containing radioactive substances 2.0 Tools Required List the type and size of the tools that would typically be used to disassemble the product to a point where components and materials requiring selective treatment can be removed. Tool Description Tool Size (if applicable)
  • Page 3 MANUFACTURING PROCESS INSTRUCTIONS MECHANICAL ASSEMBLY MODEL : Nantucket Auditor : Uen-Tung Uen-Tung Tabulator:...
  • Page 4 Standard Operation Procedure 1(1/2) Document No. Nantucket FA DIS ASS’Y SOP Station : 2017/6/15 Disassemble Nantucket & Stand Name Ver. : Date Step: 1.Take the Nantucket machine, the tension rises before Nantucket and peeps out the Stand top end to put the aperture and put the aperture . 2.
  • Page 5 Standard Operation Procedure 1(2/2) Document No. Nantucket FA DIS ASS’Y SOP Station : 2017/6/13 Disassemble FPR Name Ver. : Date Step: 1. Disassemble FPR Cable 2. Loosen BTCB screw ,Disassemble FPR & BRKT Fig.1 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Electric cross screwdriver #1...
  • Page 6: Table Of Contents

    Standard Operation Procedure 2(1/2) Document No. Nantucket FA DIS ASS’Y SOP Station : 2017/6/13 Disassemble Stand & Hub Name Ver. : Date Step: 1. Disassemble Type C Cable 2. Loosen screw *4 3. Disassemble Stand(6055B0051101) Fig.1 Fig.2 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Electric cross screwdriver #1...
  • Page 7 Standard Operation Procedure 2(2/2) Document No. Nantucket FA DIS ASS’Y SOP Station : 2017/6/13 Disassemble Stand Type C cable Name Ver. : Date Step: 1. Disassemble Stand Type C cable Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Auditor :Uen-tung...
  • Page 8: Loosen Screw *4

    Standard Operation Procedure 3(1/1) Document No. Nantucket FA DIS ASS’Y SOP Station : 2017/6/13 Disassemble Spacer Name Ver. : Date Step: 1. Loosen Spacer screw*4 2. Disassemble Spacer 圖一 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Electric cross screwdriver #1...
  • Page 9: Qty Holding Fixture List (Holding Fixture Standard)

    Standard Operation Procedure 4(1/3) Document No. Nantucket FA DIS ASS’Y SOP Station : 2017/6/13 Disassemble Type C Cover Name Ver. : Date Step: 1. Loosen Type C Cover screw*2 2. Disassemble Type-C Cover 圖一 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Electric cross screwdriver #1...
  • Page 10 Standard Operation Procedure 4(2/3) Document No. Nantucket FA DIS ASS’Y SOP Station : 2017/6/13 Loosen screw Name Ver. : Date Step: 1. Loosen front frame screw *3 Fig.1 Fig .2 Fig .3 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Electric cross screwdriver #0...
  • Page 11 Standard Operation Procedure 4(3/3) Document No. Nantucket FA DIS ASS’Y SOP Station : 2017/6/13 Disassemble front frame & LCD Name Ver. : Date Step: 1. Disassemble front frame & LCD Fig.1 Fig.2 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Auditor :Uen-tung...
  • Page 12 Standard Operation Procedure 5(1/2) Document No. Nantucket FA DIS ASS’Y SOP Station : 2017/6/13 Disassemble Touch Ctrl/B Name Ver. : Date Step: 1.Disassemble Touch Ctrl/B CNTR Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Auditor :Uen-tung NPSU-PPE...
  • Page 13 Standard Operation Procedure 5(2/2) Document No. Nantucket FA DIS ASS’Y SOP Station : 2017/6/13 Name Ver. : Date Disassemble Antenna Step: 1. Disassemble antenna TAPE. 2. Disassemble antenna. Fig .1 Fig .2 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Auditor :Uen-tung...
  • Page 14 Standard Operation Procedure 6(1/2) Document No. Nantucket FA DIS ASS’Y SOP Station : 2017/6/13 Disassemble EDP Name Ver. : Date Step: 1. Disassemble EDP TAPE. 2. Disassemble EDP. Fig .1 Fig .2 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Auditor :Uen-tung...
  • Page 15 Standard Operation Procedure 6(2/2) Document No. Nantucket FA DIS ASS’Y SOP Station : 2017/6/13 Disassemble touch ctrl/b cable Name Ver. : Date Step: 1. Disassemble touch ctrl/b cable Fig.1 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Auditor :Uen-tung...
  • Page 16 Standard Operation Procedure 7(1/1) Document No. Nantucket FA DIS ASS’Y SOP Station : 2017/6/13 Disassemble MSR LED/B Name Ver. : Date Step: 1. loosen MSR LED/B screw*1 2. Disassemble MSR Cable 3. Disassemble MSR LED/B Fig.1 Fig.2 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Electric cross screwdriver #1...
  • Page 17 Standard Operation Procedure 8(1/1) Document No. Nantucket FA DIS ASS’Y SOP Station : 2017/6/13 Disassemble CFD Name Ver. : Date Step: 1. Loosen screw *2 2. Disassemble CFD Cable 3. Disassemble CFD module Fig.1 Fig.2 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Electric cross screwdriver #1...
  • Page 18 Standard Operation Procedure 9(1/2) Document No. Nantucket FA DIS ASS’Y SOP Station : 2017/6/13 Disassemble speaker (R) Name Ver. : Date Step: 1. Disassemble speaker Tape 2. Disassemble speaker (R) Fig.1 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Auditor :Uen-tung...
  • Page 19 Standard Operation Procedure 9(2/2) Document No. Nantucket FA DIS ASS’Y SOP Station : 2017/6/13 Disassemble speaker (L) Name Ver. : Date Step: 1. Disassemble speaker (L) Fig.1 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Auditor :Uen-tung NPSU-PPE...
  • Page 20 Standard Operation Procedure 10(1/1) Document No. Nantucket FA DIS ASS’Y SOP Station : 2017/6/13 Disassemble DDR,BRKT Name Ver. : Date Step: 1.Disassemble DDR BRKT 2.Disassemble DDR *2 Fig.1 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Auditor :Uen-tung...
  • Page 21 Standard Operation Procedure 11(1/2) Document No. Nantucket FA DIS ASS’Y SOP Station : 2017/6/13 Disassemble Power/B Name Ver. : Date Step: 1. OPEN Latch,Disassemble Power FFC 2. Loosen screw*1 3. Disassemble Power/B Fig.1 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Electric cross screwdriver #1...
  • Page 22: Ver

    Standard Operation Procedure 11(2/2) Document No. Nantucket FA DIS ASS’Y SOP Station : 2017/6/13 Disassemble SSD Name Ver. : Date Step: 1. Loosen screw *1 2. Disassemble SSD Fig.1 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Electric cross screwdriver #1...
  • Page 23 Standard Operation Procedure 12(1/2) Document No. Nantucket FA DIS ASS’Y SOP Station : 2017/6/13 Disassemble MSR & BRKT Name Ver. : Date Step: 1. Loosen screw*2 2. Disassemble MSR BRKT*2 Fig.1 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Electric cross screwdriver #1...
  • Page 24 Standard Operation Procedure 12(2/2) Document No. Nantucket FA DIS ASS’Y SOP Station : 2017/6/13 Disassemble MSR Name Ver. : Date Step: 1. Loosen MSR/B Screw*1 2. Disassemble FPC 3. Disassembel MSR/B Fig.1 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Electric cross screwdriver #1...
  • Page 25 Standard Operation Procedure 13(1/3) Document No. Nantucket FA DIS ASS’Y SOP Station : 2017/6/13 Disassemble BIOS battery Name Ver. : Date Step: 1. Disassemble bios battery Fig.1 Fig.2 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Auditor :Uen-tung...
  • Page 26 Standard Operation Procedure 13(2/3) Document No. Nantucket FA DIS ASS’Y SOP Station : 2017/6/13 Loosen M/B Screw Name Ver. : Date Step: 1. Loosen M/B Screw*6 Fig.1 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Electric cross screwdriver #1 Auditor :Uen-tung...
  • Page 27 Standard Operation Procedure 13(3/3) Document No. Nantucket FA DIS ASS’Y SOP Station : 2017/6/13 Disassemble WLAN Name Ver. : Date Step: 1. Loosen screw*1 2. Disassemble WLAN Fig.1 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Electric cross screwdriver #1...
  • Page 28 Standard Operation Procedure 14(1/2) Document No. Nantucket FA DIS ASS’Y SOP Station : 2017/6/13 Disassemble FAN Name Ver. : Date Step: 1. Loosen FAN screw*5 2. Disassemble FAN Fig.1 Fig.2 Fig.3 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Electric cross screwdriver #1...
  • Page 29 Standard Operation Procedure 14(2/2) Document No. Nantucket FA DIS ASS’Y SOP Station : 2017/6/13 Disassemble M/B Name Ver. : Date Step: 1.Disassemble M/B Fig.1 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Auditor :Uen-tung NPSU-PPE...
  • Page 30 MANUFACTURING PROCESS INSTRUCTIONS MECHANICAL ASSEMBLY MODEL : Aruba Auditor : Uen-Tung Uen-Tung Tabulator:...
  • Page 31 Standard Operation Procedure 1(1/1) Document No. Aruba FA DIS ASS’Y SOP Station : Loosen screw *4 2017/6/13 Name Ver. : Date Step: 1. Loosen screw*4 Fig.1 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Electric cross screwdriver #1 Auditor :Uen-tung...
  • Page 32 Standard Operation Procedure 2(1/1) Document No. Aruba FA DIS ASS’Y SOP Station : Loosen screw *3 2017/6/13 Name Ver. : Date Step: 1. Loosen screw*3 Fig.1 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Electric cross screwdriver #1 Auditor :Uen-tung...
  • Page 33 Standard Operation Procedure 3(1/1) Document No. Aruba FA DIS ASS’Y SOP Station : Loosen screw 、Disassemble Mylar 2017/6/13 Name Ver. : Date Step: 1. Loosen screw *2 2. Disassemble Mylar 3. Disassemble sponge Fig.1 Fig.2 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Electric cross screwdriver #1...
  • Page 34 Standard Operation Procedure 4(1/1) Document No. Aruba FA DIS ASS’Y SOP Station : Disassemble screw 2017/6/13 Name Ver. : Date Step: 1. Disassemble screw*1 Fig.1 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Electric screwdriver Auditor :Uen-tung...
  • Page 35 Standard Operation Procedure 5(1/1) Document No. Aruba FA DIS ASS’Y SOP Station : Loosen screw *6 2017/6/13 Name Ver. : Date Step: 1. Loosen I/O screw*6 Fig.1 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Electric screwdriver Auditor :Uen-tung...
  • Page 36 Standard Operation Procedure 6(1/1) Document No. Aruba FA DIS ASS’Y SOP Station : 0.50 2017/6/13 Disassemble FAN Name Ver. : Date Step: 1. Loosen FAN screw*2 2. Disassemble FAN CNTR 3. Disassemble FAN TAPE*2 4. Disassemble FAN Fig.1 Fig.2 Fig.3 Notes : If finding anything uncommon, notice foreman or assistant at once.
  • Page 37 Standard Operation Procedure 7(1/1) Document No. Aruba FA DIS ASS’Y SOP Station : 2017/6/13 Disassemble FAN Cover Name Ver. : Date Step: 1. Disassemble FAN Cover Fig.1 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Auditor :Uen-tung NPSU-PPE...
  • Page 38 Standard Operation Procedure 8(1/1) Document No. Aruba FA DIS ASS’Y SOP Station : 2017/6/13 Disassemble MB screw Name Ver. : Date Step: 1. Disassemble MB screw*5 Fig.1 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Electric screwdriver T15 Auditor :Uen-tung...
  • Page 39 Standard Operation Procedure 9(1/2) Document No. Aruba FA DIS ASS’Y SOP Station : Disassemble MB 2017/6/13 Name Ver. : Date Step: 1.Disassemble MB Fig.1 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Auditor :Uen-tung NPSU-PPE...
  • Page 40 Standard Operation Procedure 9(2/2) Document No. Aruba FA DIS ASS’Y SOP Station : Disassemble DC Rubber 2017/6/13 Name Ver. : Date Step: 1.Disassemble DC Rubber Fig.1 Fig.2 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Auditor :Uen-tung NPSU-PPE...
  • Page 41 Standard Operation Procedure 10(1/1) Document No. Aruba FA DIS ASS’Y SOP Station : Disassemble Button case 2017/6/13 Name Ver. : Date Step: Disassemble Button case Fig.1 Fig.2 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Auditor :Uen-tung NPSU-PPE...
  • Page 42 MANUFACTURING PROCESS INSTRUCTIONS MECHANICAL ASSEMBLY MODEL : Nantucket Auditor : Uen-Tung Tabulator: Uen-Tung...
  • Page 43 Standard Operation Procedure 1(1/1) Document No. Nantucket bezel Air bonding DIS SOP Station : Disassemble EDP Cable 2017/6/5 Name Ver. : Date Step: 1. Disassemble EDP Cable tape 2. Disassemble EDP Cable Fig.1 Fig.2 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Auditor :Uen-Tung...
  • Page 44 Standard Operation Procedure 2(1/1) Document No. Nantucket bezel Air bonding DIS SOP Station : Disassemble RF SPONGE 2017/6/5 Name Ver. : Date Step: 1. Disassemble RF sponge Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Auditor :Uen-Tung NPSU-PPE...
  • Page 45 Standard Operation Procedure 3(1/1) Document No. Nantucket bezel Air bonding DIS SOP Station : Disassemble EMI SPONGE 2017/6/5 Name Ver. : Date Step: 1. Disassemble EMI SPONGE Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Auditor :Uen-Tung NPSU-PPE...
  • Page 46 Standard Operation Procedure 4(1/1) Document No. Nantucket bezel Air bonding DIS SOP Station : Disassemble touch ctrl/B 2017/6/5 Name Ver. : Date Step: 1. Disassemble Touch FFC 2. Disassemble Touch/B Fig.1 Fig.2 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Auditor :Uen-Tung...
  • Page 47 Standard Operation Procedure 5(1/1) Document No. Nantucket bezel Air bonding DIS SOP Station : 2017/6/5 Disassemble Tape Name Ver. : Date Step: 1. Disassemble Tape*2 Fig.1 Fig.2 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Auditor :Uen-Tung NPSU-PPE...
  • Page 48 Standard Operation Procedure 6(1/1) Document No. Nantucket bezel Air bonding DIS SOP Station : Disassemble Main antenna 2017/6/5 Name Ver. : Date Step: 1. Disassemble LCM Main antenna Fig.1 Fig.2 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Auditor :Uen-Tung...
  • Page 49 Standard Operation Procedure 7(1/1) Document No. Nantucket bezel Air bonding DIS SOP Station : Disassemble AUX antenna 2017/6/5 Name Ver. : Date Step: 1. Disassemble LCM AUX antenna Fig.1 Aux 天線 Fig.2 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Auditor :Uen-Tung...
  • Page 50 Standard Operation Procedure 8(1/1) Document No. Nantucket bezel Air bonding DIS SOP Station : Disassemble Mylar 2017/6/5 Name Ver. : Date Step: 1. Disassemble LCM Mylar Fig.1 Fig.2 Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Auditor :Uen-Tung...
  • Page 51 Standard Operation Procedure 9(1/1) Document No. Nantucket bezel Air bonding DIS SOP Station : Disassemble Glass 2017/6/5 Name Ver. : Date Step: 1. LCM module puts into Nantucket to heat to heat in the disassembly equipment Note: • Time:5Min • Heat the temperature:80±5℃ Fig.1 Notes : If finding anything uncommon, notice foreman or assistant at once.
  • Page 52 Standard Operation Procedure 10(1/1) Document No. Nantucket bezel Air bonding DIS SOP Station : Disassemble Glass 2017/6/5 Name Ver. : Date Step: 1.The LCM module after the heating take out, the employment manage wire bar seriatim glass with previous the frame split 2.At use to manage the wire bar to take care of glass and lamp the separation Fig.1...
  • Page 53 Standard Operation Procedure 11(1/1) Document No. Nantucket bezel Air bonding DIS SOP Station : Disassemble LCD 2017/6/5 Name Ver. : Date Step: 1. Loosen screw*4 2. Disassemble LCD Notes : If finding anything uncommon, notice foreman or assistant at once. Holding fixture list (holding fixture standard) Holding fixture list (holding fixture standard) Electric cross screwdriver #1...

Table of Contents