HP ElitePOS G1 Disassembly Instructions Manual page 47

14 inch touch aio retail system model 141
Table of Contents

Advertisement

Document No. Nantucket bezel Air bonding DIS SOP
Name
:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Tabulator:
Uen-Tung
Standard Operation Procedure
Disassemble Tape
Fig.1
Auditor :Uen-Tung
Ver. :
Step:
1. Disassemble Tape*2
Qty
Holding fixture list (holding fixture standard)
Station :
1.0
Date
Fig.2
Issue department:
5(1/1)
2017/6/5
:
Qty
NPSU-PPE

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents