Document No. Nantucket bezel Air bonding DIS SOP
Name
:
Notes : If finding anything uncommon, notice foreman or assistant at once.
Holding fixture list (holding fixture standard)
Tabulator:
Uen-Tung
Standard Operation Procedure
Disassemble EDP Cable
Fig.1
Fig.2
Auditor :Uen-Tung
Ver. :
Step:
1. Disassemble EDP Cable tape
2. Disassemble EDP Cable
Qty
Holding fixture list (holding fixture standard)
Station :
1.0
Date
Issue department:
1(1/1)
2017/6/5
:
Qty
NPSU-PPE