Physical Addresses - Preparing And Addressing Devices Manually; Physical Addresses - Preparing Addressing - ABB Welcome IP System Manual

Hide thumbs Also See for Welcome IP:
Table of Contents

Advertisement

4.2
Physical addresses ― Preparing and addressing devices manually
If the devices have a display, the addressing is carried out on the device itself.
If the devices do not have a display, the addressing is carried out via the indoor station.
4.2.1
Physical addresses ― Preparing addressing
For commissioning you are located in:
Overview of commissioning:
Fig. 15:
Preparation of commissioning
1. Connect the devices to the indoor station via a PoE switch.
As soon as the devices are supplied with voltage via the PoE switch, the device boots
up automatically.
System Manual 2CKA000073B9795
Commissioning
Section 1 (Preparing the devices)
see chapter 4.1 "Overview of commissioning"
on page 30
│33

Advertisement

Table of Contents
loading

Table of Contents