Mounting In Clinker Facades; Mounting In Insulated Facades - ABB Welcome IP System Manual

Hide thumbs Also See for Welcome IP:
Table of Contents

Advertisement

2.4.7

Mounting in clinker facades

Chisel a hole according to the size of the outdoor station used into the facade provided. The
suitable template is enclosed with the box. Dimensional drawings, .
The installation depth of the box is 40 mm.
Fig. 7:
Mounting instructions for the flush-mounted
housing
Fix the flush-mounted installation box into the cut-out of the facade with the aid of the elongated
holes. You can fill the hollow spaces between the box and clinkers with PU foam. Break out the
holes in the corners angled at 45°. Insert the extension tube of the PU foam and fill the cavities.
Note
Use a low-expansion foam to prevent foam from entering the flush-mounted box.
If necessary, use foam cleanser to remove the contaminations.
No additional accessories are necessary for mounting.
2.4.8

Mounting in insulated facades

Fig. 8:
Fixing the flush-mounted box to the device
carrier
System Manual 2CKA000073B9795
Overview of product range
Note
The encircling "collar" of the flush-
mounted box must rest on the facade!
1. Fix the flush-mounted box to a device
carrier that is suitable for the
insulated exterior facades (e.g.
universal device supports, from
Kaiser).
│22

Advertisement

Table of Contents
loading

Table of Contents